Luke's RTX 4090 memory upgrade needs a whole new board
Linus Tech Tips visits Michigan specialist Greg Sky for a delicate hardware transplant designed to run AI locally.
No. 68 on the daily chartNo. 4 on the Tech chart
Why this story? One of the most watched videos since yesterday, with 791,333 views.
I Doubled My GPU’s Memory…
Things we can learn from the video
Press to jump
- 3:20Custom circuit boards hold memory on both sides, allowing each RTX 4090's capacity to double.
- 8:55Greg removes GPU cores and memory modules from the donor cards using infrared heat.
- 14:34Stencils position fresh solder balls across the GPU cores before reflow in an infrared oven.
- 20:00Optical alignment lines up the GPU core's solder connections with the replacement board.
- 24:05The assembled card boots into Windows and runs a Vulkan memory test for stability and bandwidth.
- 25:00An ultrasonic water bath removes residual flux, followed by air-drying and a twelve-hour oven bake.
Getting more memory for a graphics card usually means replacing the card. Luke heads to a Michigan workshop to try something considerably more involved: keeping its valuable chips, but giving them a new home.
In Linus Tech Tips' "I Doubled My GPU's Memory…", hardware specialist Greg Sky helps turn two RTX 4090 cards into versions with 48GB of memory each, twice their original capacity. The upload has drawn about 791,000 views since yesterday. Luke's aim is to run AI on his own hardware rather than rely on cloud subscriptions.
This isn't a matter of clicking another memory stick into a slot. Custom circuit boards accommodate memory chips on both sides, and the donor cards surrender their GPU cores and memory modules under infrared heat. Greg and Luke clean the contact pads, apply fresh solder balls and carefully position the components for their new boards.
The equipment does some extraordinarily precise work. An optical alignment system lets them line up the GPU core's solder connections before heating it into place. Luke gets hands-on throughout, moving from "I can't see anything" during an early attempt to a delighted "I got a job!" later in the process.
The finished card boots into Windows, where they run a memory test to check stability and bandwidth. There is still an unexpectedly domestic-looking finish: an ultrasonic water bath to remove flux, followed by drying and a long oven bake before shipping. The video also contains sponsored smart-ring segments.
Among the comments, viewers pick out Luke's hosting return, compare Greg's workshop to a Half-Life 2 setting and notice the IBM Model M keyboard on the test bench. Greg gives his visiting apprentice a company shirt and welcomes him to the team. Luke settles on a more modest title: "Honorary employee."
Published on Trari
Where next?
- Channel
- Linus Tech Tips
- Subscribers
- 16,900,000
- Channel views, last 7 days
- 18,828,418
- Channel views, pace per day
- 938,741 (on a normal day: 2,918,682)
- Video published
- October 31, 2026
- Video views so far
- 791,333 (less than a day online)
- Video views, pace per day
- 1,202,039
The numbers
The memory-upgrade video drew a substantial audience before its first full day was over. Here are its views and early responses.
💡 Test your knowledge
Which state does Luke visit for the graphics-card upgrade?
Luke travels to Michigan to work with Greg Sky on the memory upgrades.


